We Serve the Edible Oil Industry
Building New Industrial Facilities from the scratch
Working Steps, we follow for successful Execution of Project
Understanding the requirement of the client
Feasibility Study
Based on the input received from our clients after detailed discussion, our technical team internally makes a feasibility study in regards to offering the right project in terms of capacity & technicality.
Project Guidance
After internal feasibility study of the project, we return back to the customer for detailed discussion on the project to offer for making it a viable & profitable project for the customer and guide them accordingly.
Factory Allocation for Project Execution
Once the manufacturing schedule is fixed, a job number is being allotted to the project and is then allocated to our factory for manufacturing the project.
Internal or Third Party Inspection
Our quality team do periodic inspection of the project during the manufacturing process, however we are open for third party inspection also, if the customer desires for it.
Submission of Quality Check Certificate
Project Planning
Submission of Bill of Lading
Submission of Techno Commercial offer
Techno Commercial Discussion
Finalization of Order
Detailed Drawing
Manufacturing Schedule
After the detailed drawing, the project team seats with the production & Quality team for creating a manufacturing schedule of a particular project and on finalization of the schedule, the same is being sent to the customer.
Quarterly updation of Project Manufacturing Status
During the time of manufacturing the project on every quarter we use to send the status of manufacturing of the project, to enable the customer to understand the progress of manufacturing of his project.
Customers Intimation of Shipment reached at Sight
Submission of visit schedule for technicians for erection & commissioning
Installation & Commissioning
Training of customers Factory Technicians
During the installation & Commissioning process, our technical supervisors provide training to the local plant operators of the customer’s factory and educate them about the nitigrities of the plant, so that if need arises, the local plant operators on urgent basis can fix the problem of the plant.
Running of the Plant to ensure matching output with the performance guarantee offered
After the commissioning of the plant, out site engineers under the supervision of our site supervisor runs the plant to see if the plant is giving the matching output as per the performance guarantee offered.
Receipt of certificate of Successful commission from the client
Even after successful commissioning of the plant, our site engineers do not leave the factory site unless our customer checks all parameters of the plant running and on being satisfied with the output provides us with a Certificate of successful Commissioning
Have questions?
Get in touch!
We are ready to assist with your engineering requirements. Reach out to our project desk through any of the following channels, and our technical team will get back to you with a preliminary assessment.